Contact Us

800 5th Avenue, Suite 4100

Seattle, WA 98104​

Email: info@robinkirschbaum.com
Tel:  206.406.1862

  • LinkedIn - Grey Circle

© 2015 Robin Kirschbaum, Inc.   |     Website: Sayre Coombs Design

Hydrologic / Hydraulic Analysis

2019 STORMWATER MANAGEMENT MANUAL FOR EASTERN WASHINGTON UPDATE

Ecology, working with a Steering Committee of Eastern Washington Phase II National Pollutant Discharge Elimination System (NPDES) permittees, completed a 2019 update of the Stormwater Management Manual for Eastern Washington. RKI helped incorporate the latest advances in design, construction, and maintenance techniques for conventional and Low Impact Development stormwater BMPs into the manual and provided team facilitation and public outreach, helping to gather and incorporate necessary inputs for successful use of the manual.

Washington State Department of Ecology
Author, Public Outreach Lead, Facilitation Lead
Seattle, WA

DELRIDGE MULTIMODAL CORRIDOR IMPROVEMENTS

The Delridge Multimodal Improvements Project, a 4-mile corridor within Delridge Way SW from the West Seattle Bridge to Roxbury Street SW, will install 26 enhanced RapidRide Stations, improve bike and pedestrian connections to transit, and provide greenway connections. Serving as Drainage Design Lead, RKI is responsible for code compliance, hydrologic/hydraulic analysis, basis of design and design coordination for final design of stormwater management facilities.

City of Seattle
Drainage Design Lead
Seattle, WA

2019 EAST BREMERTON & EAST PORT ORCHARD STORMWATER RETROFIT PLAN

Kitsap County Public Works (KCPW) developed a stormwater retrofit plan for East Bremerton and East Port Orchard to identify, prioritize and construct stormwater retrofit projects that address water quality and drainage problems. Both Green Stormwater Solutions and conventional stormwater techniques are used. The end result is a suite of management planning tools, including a prioritized list of projects and conceptual designs to support KCPW’s Capital Facility Plan and assist with obtaining grant funding for final design and construction of priority projects.

Kitsap County
Project Manager/Lead Engineer
Port Orchard, WA

SPU VINE BASIN CSO CONTROL PROJECT

As part of its Plan to Protect Seattle’s Waterways, SPU committed to constructing green and/or gray infrastructure that will bring the Vine basin into compliance with Combined Sewer Overflow (CSO) regulatory requirements by the end of 2025. Serving as GSI Lead, RKI helped SPU develop and evaluate GSI options and select the preferred option to be advanced to final design and construction.

City of Seattle
GSI Lead
Seattle, WA

Business News

Keep your clients up to date with what's happening. To make this content your own, just add your images, text and links, or connect to data from your collection.  

Heading 5
Heading 5
Heading 5

INVESTMENTS STOCKS & BONDS

Keep your clients up to date with what's happening. To make this content your own, just add your images, text and links, or connect to data from your collection.  

Heading 5
Heading 5
Heading 5

REAL ESTATE

Keep your clients up to date with what's happening. To make this content your own, just add your images, text and links, or connect to data from your collection.  

Heading 5
Heading 5
Heading 5

Technology

Keep your clients up to date with what's happening. To make this content your own, just add your images, text and links, or connect to data from your collection.  

Heading 5
Heading 5
Heading 5

Business News

Keep your clients up to date with what's happening. To make this content your own, just add your images, text and links, or connect to data from your collection.  

Heading 5
Heading 5
Heading 5

INVESTMENTS STOCKS & BONDS

Keep your clients up to date with what's happening. To make this content your own, just add your images, text and links, or connect to data from your collection.  

Heading 5
Heading 5
Heading 5

REAL ESTATE

Keep your clients up to date with what's happening. To make this content your own, just add your images, text and links, or connect to data from your collection.  

Heading 5
Heading 5
Heading 5

Technology

Keep your clients up to date with what's happening. To make this content your own, just add your images, text and links, or connect to data from your collection.  

Heading 5
Heading 5
Heading 5

2019 STORMWATER MANAGEMENT MANUAL FOR EASTERN WASHINGTON UPDATE

Ecology, working with a Steering Committee of Eastern Washington Phase II National Pollutant Discharge Elimination System (NPDES) permittees, completed a 2019 update of the Stormwater Management Manual for Eastern Washington. RKI helped incorporate the latest advances in design, construction, and maintenance techniques for conventional and Low Impact Development stormwater BMPs into the manual and provided team facilitation and public outreach, helping to gather and incorporate necessary inputs for successful use of the manual.

Washington State Department of Ecology
Author, Public Outreach Lead, Facilitation Lead
Seattle, WA

DELRIDGE MULTIMODAL CORRIDOR IMPROVEMENTS

The Delridge Multimodal Improvements Project, a 4-mile corridor within Delridge Way SW from the West Seattle Bridge to Roxbury Street SW, will install 26 enhanced RapidRide Stations, improve bike and pedestrian connections to transit, and provide greenway connections. Serving as Drainage Design Lead, RKI is responsible for code compliance, hydrologic/hydraulic analysis, basis of design and design coordination for final design of stormwater management facilities.

Seattle Department of Transportation
Drainage Design Lead
Seattle, WA

2019 EAST BREMERTON & EAST PORT ORCHARD STORMWATER RETROFIT PLAN

Kitsap County Public Works (KCPW) developed a stormwater retrofit plan for East Bremerton and East Port Orchard to identify, prioritize and construct stormwater retrofit projects that address water quality and drainage problems. Both Green Stormwater Solutions and conventional stormwater techniques are used. The end result is a suite of management planning tools, including a prioritized list of projects and conceptual designs to support KCPW’s Capital Facility Plan and assist with obtaining grant funding for final design and construction of priority projects.

Kitsap County Public Works
Project Manager/Lead Engineer
Port Orchard, WA

SPU VINE BASIN CSO CONTROL PROJECT

As part of its Plan to Protect Seattle’s Waterways, SPU committed to constructing green and/or gray infrastructure that will bring the Vine basin into compliance with Combined Sewer Overflow (CSO) regulatory requirements by the end of 2025. Serving as GSI Lead, RKI helped SPU develop and evaluate GSI options and select the preferred option to be advanced to final design and construction.

Seattle Public Utilities
GSI Lead
Seattle, WA