$w.onReady(function () { let user = wixUsers.currentUser; let userRole = user.role; // "employee" // if statment to allow user view or download });
top of page
redjobs_redmond.gov.jpg

City of Everett

2018 PERMITTING SERVICES ON-CALL

Everett, WA
Project Manager

In response to Ecology’s reissuance of the National Pollutant Discharge Elimination System (NPDES) Phase II Municipal Stormwater Permit, the City was required to update their Stormwater Management Manual (SWMM) to make Low Impact Development (LID) the preferred and commonly used approach to new and redevelopment. RKI provided on-call engineering services to assist with implementing the updated SWMM and provided development review support.

2017 ENGINEERING AND NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM TECHNICAL SUPPORT ON-CALL

Everett, WA
Project Manager

RKI provided on-call services to assist with implementation of the City’s 2016 update of their engineering standards, including new requirements for Low Impact Development (LID), and provided technical support for compliance with the western Washington Phase II National Pollutant Discharge Elimination System (NPDES) permit.

2016 LOW IMPACT DEVELOPMENT CODE AND NATIONAL POLLUTANT DISCHARGE AND ELIMINATION SYSTEM ON-CALL SUPPORT

Everett, WA
Project Manager

RKI provided on-call services to the City of Everett Public Works to assist with the City's 2016 Low Impact Development (LID) code update; provide technical assistance with the Western Washington Phase II National Pollutant Discharge Elimination System (NPDES) permit compliance strategy; and conduct training for staff from Public Works, Transportation, Parks, and Permit Services on how to work with the new code and permit requirements.

MORE OF OUR CLIENTS

bottom of page